Broadcast Storm Shuts Down DCS Consoles

Event Year: 1997 Reliability: Likely But Unconfirmed
Country: Canada
Industry Type: Pulp and Paper
Description:

The facility lost communications to the operator consoles on a steam plant DCS.  The problem was believed to be caused by an incorrectly configured Windows 95 workstation in another mill area that generated high levels of broadcast packets.

Impact:

The DCS had to be removed from the mill network, preventing process data from being transferred to the business systems.

Action Description: Installation of separate subnets and VLANs for process control