RISI

← Back to database

Weekly Connection Loss to PLCs

Event Year
2004
Reliability
Confirmed
Country
Switzerland
Industry
Other

Description

Occasional communication connection loss to the PLC hindered the smooth running of the temperature monitoring system. The affected Siemens PLC (CP343-1) needed to be power cycled to restore its operation. The frequency has been about once a week without any regularity. Current suspect is a malformed packet accepted by the PLC, but this has never been confirmed.

Impact

Loss of control on the production facility.