Weekly Connection Loss to PLCs
Event Year: | 2004 | Reliability: | Confirmed |
---|---|---|---|
Country: | Switzerland | ||
Industry Type: | Other | ||
Description: | Occasional communication connection loss to the PLC hindered the smooth running of the temperature monitoring system. The affected Siemens PLC (CP343-1) needed to be power cycled to restore its operation. The frequency has been about once a week without any regularity. Current suspect is a malformed packet accepted by the PLC, but this has never been confirmed. |
||
Impact: | Loss of control on the production facility. |
||
Action Description: | The modules were exchanged and upgraded to the most recent firmware version after confirmation with Siemens. The problem has been solved by this. |